Commercial Projects

New construction or retrofits. We plan, construct and deliver excellence.

Concrete tilt-up, flying form systems, pre-casting/erection, pre-engineered metal structures, multi-unit construction, hotel/resort development, processing facilities, storage and freezer facilities, public works buildings, government/military projects, religious centers, office/retail complexes.

Bavarian Lodge

9-18-14 006.JPG
7-2-14 057.JPG
Bav_Jul_05.jpg
bav_01.jpg
10-28-13+Bav+Lodge.JPG
11-6-13+Bav+Lodge+2.JPG
10-28-13+Bav+Lodge+(3).JPG
10302013+Bavarian+Lodge+PH+II+007.JPG
10302013+Bavarian+Lodge+PH+II+009.JPG
10302013+Bavarian+Lodge+PH+II+013.JPG
Bav+Lodge+Oct+2013+(11).JPG
Bav+Lodge+Oct+2013+(16).JPG
10302013+Bavarian+Lodge+PH+II+007.JPG
10302013+Bavarian+Lodge+PH+II+009.JPG
BavLodge12.jpg
08-14-14.jpg
9-18-14 006.JPG
7-2-14 057.JPG
Bav_Jul_05.jpg
bav_01.jpg
10-28-13+Bav+Lodge.JPG
11-6-13+Bav+Lodge+2.JPG
10-28-13+Bav+Lodge+(3).JPG
10302013+Bavarian+Lodge+PH+II+007.JPG
10302013+Bavarian+Lodge+PH+II+009.JPG
10302013+Bavarian+Lodge+PH+II+013.JPG
Bav+Lodge+Oct+2013+(11).JPG
Bav+Lodge+Oct+2013+(16).JPG
10302013+Bavarian+Lodge+PH+II+007.JPG
10302013+Bavarian+Lodge+PH+II+009.JPG
BavLodge12.jpg
08-14-14.jpg

Bavarian Lodge

$1.00

Phase 1 Construction | Four-floors, 54 guest rooms, 34,000 sqft

  • Located on Hwy 2 across from the downtown core in Leavenworth, WA.

  • Featuring a guest lobby, breakfast room, conference rooms, guest laundry, ski storage, and a swimming pool.

  • The lodge showcases multiple turret architectural suites complete with soaking tubs that over look town and mountainous views.

  • An ice-melt system, installed at the front and rear entry, along with heated sidewalk and pool area eases snow management during the winter months.

  • The construction includes handicap facilities for hearing impaired, complete wheelchair accessibility and individually controlled heating and cooling units throughout the guest suites.  

  • Reflecting a traditional, Bavarian design, the stucco exterior is complimented by scrolled wood beams, facias, fencing, planter boxes and flourishes.

  • R&R was hired again to also construct a large, conference room addition.

Phase 2 (Expansion): 42 guest rooms, 3 floors, connects to original structure

  • Completed in 2014, R&R was, again, hired to complete the project. In addition to the large expansion, Phase 2 also includes an underground parking garage beneath the first floor of the new structure.

Add To Cart