Rimmer & Roeter Construction, Inc. is an exclusive Butler Builder® for Pre-Engineered Metal Buildings in Central Washington. We specialize in metal buildings that offer design flexibility, cost efficiency, and durability—from agricultural buildings, multi-use, arenas, industrial warehouses, commercial facilities, government structures, and retail applications.

  • 41,800 Square foot

    Construction of a new bus garage for electrical vehicle charging at Link Transit’s Operations center in Wenatchee, WA. The new building is a Pre-Engineered Metal Building with metal siding, store front windows, polycarbonate windows, skylights, and a heated slab. Includes charging stations for 14 buses now with the capacity to charge over 40 in the future. The project is scheduled to be completed end of June, 2025.


  • THE BUILDINGS ARE INSPIRED BY THE DISTILLERY’S PRODUCTION AND TASTING FACILITY IN WOODINVILLE, WASHINGTON. THE LARGE STRUCTURES ARE 70 FEET-WIDE-BY-400-FEET-LONG.

    Leveraging the economy of prefabricated metal buildings, the team determined manufactured structures would be cost effective while still maintaining the agricultural look set amongst the wheat fields of Eastern Washington.

    Project team
    Graham Baba Architects (architecture and interior design)
    JSL Engineering (civil and structural engineering)
    Western Pacific Engineering (geotechnical engineer)
    AHBL (landscape architecture)
    REAX Engineering (fire protection consultant)
    Rimmer & Roeter (contractor)
    Woodinville Whiskey/LVMH (client)

    Metal Architecture Article


  • 23,500 sf Pre-engineered metal building supplied by Butler Manufacturing

    This 2 story building is a combination of office, fabrication, and storage. The mezzanine structure was incorporated into the Butler Building.  Zwei provides custom and specialty parts for Hydraulic Pump systems including specialized equipment specific to their work. The floor plan is laid out in a manner that optimizers the owners work flow and one highlight is the custom powder coated steel stairs/railings by Cascaded Powder Coating.

    *Architect: MJ Neal and Associates

    *Structural Engineer: GLR Engineers

    *Civil Engineer: Torrence Engineering


  • Currently in progress - 44,100 SF

    The new Community Center will have an 10,000 sf auditorium/gym (full size basketball court), coffee shop, full commercial kitchen, kids indoor play area,  flexible work space, and multi-purpose rooms with the possibility of hosting all types of events.  The building is a 2 story pre-engineered metal building with an elegant design of metal siding panels. Butler Manufacturing supplied the metal building structure. Completion is scheduled for the fall of 2023.

    Architect/Engineering Firm: Complete Design

    Civil Engineer: Torrence Engineering

    Mechanical Engineer Firm: Meier Architecture & Engineering

    Landscape Architect: Place Landscape Architecture

     The building will be a LEED Silver project when it is completed.

     The project is being funded by donations & grants, so if you would like to donate to the cause of this great project. Please visit:  https://ccatlakechelan.org/


  • Expanded horse barn

    The Association has made extensive investments in physical facilities that include both indoor and outdoor arenas, as well as barns for stabling members' horses, as you see in the above photo.


  • Description to come.


  • PRE-ENGINEERED SHOP & PAINT BOOTH BUILDINGS

    A pre-engineered shop intended for temporary use, still standing strong today.


  • Removal and replacement of a 31,800 SF structural steel roof superstructure over an existing potato processing area.  The work included installation of new concrete footings, steel columns/beams/girders/joists and decking, insulated metal wall panels, insulated metal walk-on ceiling panels and an insulated single-ply roofing system.  This work was done over a period of three years, with only two 30-day shutdowns; the rest of the time McCain Foods continued to make products.